Author Topic: HDD / GPU test in background  (Read 2585 times)

Offline Jeppe

  • Newbie
  • *
  • Posts: 9
Hello,

Is it possible to run the hardware tests in the background of the user tests.

So it runs my Memory/CPU/HDD tests, at the same time as i am doing the Keyboard/webcam/monitor/sound tests?

Best regards

Offline PCD_James

  • Moderator
  • Jr. Member
  • *****
  • Posts: 90
Hi Jeppe,

Which product are you currently using to perform testing?

Offline Jeppe

  • Newbie
  • *
  • Posts: 9
Hi Jeppe,

Which product are you currently using to perform testing?

Hi,

Everything from version 9 to 12 of the ServiceCenter.

Offline PCD_James

  • Moderator
  • Jr. Member
  • *****
  • Posts: 90
Yes, this is possible. To do this check the parallel box in the script editor as shown in the image below.


Offline Jeppe

  • Newbie
  • *
  • Posts: 9
Yes, this is possible. To do this check the parallel box in the script editor as shown in the image below.
Okay, so by doing that, it runs all tests that are next to eachother with paralelle enabled.

We have all of our interactive tests at the start of the script, and i would like all the system tests to start running the second PCDoctor opens, not when i reach the first time i have a parallele ticked on.

And if i put the system tests after the first interactive, i have to wait for all of them to finish before the next interactive test can begin.